Project Resumes

We are pleased to share with you a highlight of our most notable projects, and the company relationships that are on going... some for 60 years!

It all started when...

During the cold war, after World War II, the Soviet Union developed a magnetic mine.  To counter this threat, the U.S. Navy needed minesweeping ships that would not be susceptible to the magnetic mines.  Bellingham Shipyards, owned by Archie Talbot,...

Best Real Estate Management professionally manages a large number of residential rental properties.  For many years Best has contracted Blythe for the plumbing and HVAC service work that its own staff does not perform.

Blythe was awarded the mechanical subcontract for this 44,539 sq. ft., single-story elementary school. The project featured classroom, administrative, and audio-visual auditorium space as well as a full-service kitchen, gymnasium, cafeteria, and library. HVAC was provided through a hydronic...

This 2,000 sq. ft. building is located within a process unit at BP Cherry Point.  

Blythe was awarded the mechanical contract, which includes heating and ventilation equipment designed for hazardous locations and required to fit within critical structural and equipment...

The mechanical contract for this project, which consists of a 98,000 sq. ft. Maintenance Services Complex and a 28,000 sq. ft. Warehouse Facility, was awarded to Blythe.

Mechanical systems installed include a VAV system with hydronic reheat; domestic plumbing; non-potable water; oily...

This 10,000 sq. ft. lab was constructed for testing combustible products including gasoline and diesel.    

The HVAC systems include variable air volume supply, fume exhaust, and gas phase filtration.   Fume exhaust was accomplished utilizing variable flow...

For its 43,000 square foot manufacturing plant, Dri Eaz Products, Inc. selected Blythe as its design-build mechanical contractor. 

The project included ventilation and exhaust air systems, compressed air, natural gas and industrial plumbing systems for the manufacturing areas; and...

For this 35,000 sq. ft. meat processing facility, which includes varied and exacting mechanical systems, Blythe was selected to be the design-build mechanical contractor. 

Systems designed and installed include a steam boiler with medium and low pressure piping, medium and low...

Blythe was selected to be the mechanical contractor for the Island Hospital project in Anacortes. 

The project included a 70,000 sq. ft.

This institutional project was originally designed and bid on a plan/spec basis.  Because it was seriously over budget, the owner elected to pursue a design-build process. 

Blythe was part of the successful project proposing team, and the complete project was built within...

It all started back when...

In 1954, D.C. Morse Jr. picked strawberries at Maberry Farms for summer employment. His son, Dave Morse III followed in his footprints in the summers of 1985 and 1986.  In the 1990’s, as Maberry transitioned from growing berries to also processing...

This design build project was for the renovation of mechanical plant systems

Those system included replacement of a chiller and cooling towers, installation of a water side economizer, addition of a heat recovery system, and refurbishment of seven large air handlers for this 100,000 sq...

Blythe was awarded the mechanical and plumbing contract for the Hangar 6 Renovation and Reconstruction Project. The project consisted of 189,000 square feet of renovated space, including two 49,000 sq. ft. aircraft maintenance hangars between three support and office buildings.

Through a qualifications interview process Blythe was selected to install the HVAC, plumbing, and DDC controls systems for the Peace Arch Border Station.

The facility offers exercise and shower rooms, laboratory space, conference room, office and training space, criminal detention cells...

Blythe was selected by the general contractor and owner to perform design-build services for the shell/core portion of the four story Skagit Valley Medical Office building.

Blythe was selected as the design-build mechanical contractor for this 47,000 sq. ft.

This design build project was for the complete renovation of two mechanical rooms, MER 2 and MER 8, at the VA Hospital in Seattle.

The project consisted of replacing two air handlers and associated VAV boxes serving approximately 40,000 sq. ft.   Because access and space...

Blythe was selected to be the mechanical contractor for the Chemistry Building Remodel at Western Washington University.  

The project included the remodel of an existing lab and construction of additional laboratory space.  Fume exhaust was accomplished utilizing variable...

Blythe was awarded the mechanical subcontract for this 125,000 sq. ft. multi-story facility. 

The project features natural ventilation throughout the office and common areas, steam heat exchangers for hydronic heating and potable hot water, two floors of biology...