BP Cherry Point Lean DEA HSS Solutions Building

Owner: 
BP P.L.C.
Location: 
Blaine, Wa
Date of Work: 
2005
Budget: 
$21,000
General Contractor: 
Haskell Corporation
Contact: 
Terrance Corrigan, 360.734.1200

This 2,000 sq. ft. building is located within a process unit at BP Cherry Point.  

Blythe was awarded the mechanical contract, which includes heating and ventilation equipment designed for hazardous locations and required to fit within critical structural and equipment constraints, and a pneumatic control system.  Work was completed on time and with no injuries.